Ellipse Waterfall exterior render

Tricolt · Waterfall City

Ellipse Waterfall

Four sculpted towers at the heart of Waterfall City.

Price from
R 1 395 000
Gross yield
8.3% gross / 6.5% net
Projected ROI
11.6% p.a. blended
Completion
Q1 2027 (Tower 4)

Overview

Luxury Tower Residences in Magwa Crescent, Waterfall City, Midrand

Ellipse Waterfall is the tallest residential development in Waterfall City — four curved towers rising above a landscaped podium with pools, a gym, a padel court and a residents' lounge. Apartments are north-facing with floor-to-ceiling glazing and views across the Waterfall precinct to the Magaliesberg.

  • Tallest residential towers in Waterfall City
  • Podium pools, gym, padel court and residents' lounge
  • Private precinct infrastructure — power, water and security
  • 800 m from Mall of Africa and Netcare Waterfall City Hospital
  • Towers 1–3 already delivered and fully tenanted

Construction

68%

Tower 4 selling — Towers 1–3 occupied

Enquire about this project

Unit schedule

Prices, sizes and returns

Unit typeSizePriceDepositMonthly bondTermEst. rentalROI
Studio34 – 40 m²R 1 395 000R 140 000R 13 200240 months (20-year bond)R 10 500 pm9.0% gross
1 Bedroom50 – 62 m²R 1 950 000R 195 000R 18 400240 months (20-year bond)R 14 500 pm8.9% gross
2 Bedroom84 – 102 m²R 3 250 000R 325 000R 30 700240 months (20-year bond)R 23 500 pm8.7% gross
3 Bedroom132 – 158 m²R 5 250 000R 525 000R 49 600240 months (20-year bond)R 36 000 pm8.2% gross

Bond repayments modelled at the current South African prime rate of 11.25% over 20 years. Figures are indicative and subject to bank approval.

Payment plan

Staged developer instalment plan

Deposit

15% deposit split over the first three months

During construction

25% in equal quarterly instalments linked to construction milestones (slab, topping-out, facade)

On completion

60% on transfer, bond registration and occupation

Bond finance

Up to 100% bonds available for South African residents; 50% LTV for non-resident buyers

Instalments are interest-free and held in a Section 78(2A) attorney trust account.

Investment analysis

Model your return

Gross rental yield
9.03%
Net rental yield
7.05%
Net annual income
R 98 280
Cash invested
R 139 500
Value in 5 years
R 1 866 825
5-yr return on equity
690%

Assumes 22% of gross rental absorbed by levies, rates, management and vacancy. Illustrative only — not financial advice.

Gallery

Renders, interiors and site progress

Programme

Construction timeline

  1. Completed

    Land acquisition & rights approved

    Complete

  2. Completed

    Bulk earthworks & piling

    Complete

  3. Completed

    Basement & podium structure

    Complete

  4. Programmed

    Superstructure & topping out

    Scheduled

  5. Programmed

    Facade, glazing & fit-out

    Scheduled

  6. Q1 2027 (Tower 4)

    Practical completion & transfer

    Scheduled

Amenities & location

What surrounds the building

Amenities

  • 24/7 manned security & biometric access
  • Backup power and water infrastructure
  • Rooftop infinity pool & sun deck
  • Fully equipped fitness studio
  • Co-working lounge and boardroom
  • Concierge and parcel management
  • Fibre-ready throughout
  • Secure basement parking
  • Landscaped podium gardens
  • Pet-friendly policy

Schools

  • Curro Waterfall (1 km)
  • Reddam House Waterfall (2 km)
  • Crawford International (3 km)

Healthcare

  • Netcare Waterfall City Hospital (1.5 km)
  • Life Carstenhof (7 km)

Retail

  • Mall of Africa (1 km)
  • Waterfall Corner (2 km)
  • Kyalami Corner (6 km)

Transport

  • Allandale Road interchange (1 km)
  • Midrand Gautrain (5 km)
  • N1 Highway (2 km)

FAQs

Common questions

Can foreign nationals buy at Ellipse Waterfall?

Yes. Non-residents may purchase South African property in their own name. Funds must be introduced through an authorised dealer bank and recorded as foreign capital so proceeds can be repatriated on resale. Non-residents typically qualify for a 50% loan-to-value local bond.

What is payable in addition to the purchase price?

New off-plan developments carry no transfer duty — VAT is included in the listed price. Buyers pay bond registration costs where a bond is raised, plus a first levy contribution and municipal deposit on occupation.

When is occupation expected?

Practical completion and first occupation are programmed for Q1 2027 (Tower 4), subject to the standard construction contract provisions.

Is my deposit protected?

All deposits are held in a Section 78(2A) interest-bearing attorney trust account in the purchaser's favour until transfer, and the development is registered with the NHBRC.

Do you assist with letting after transfer?

Yes. PrimeStone Rentals offers a full letting and management mandate covering tenant placement, compliance and monthly reporting at 8% of gross rental.